Sunday, January 26, 2020
How Mature is Mature?
How Mature is Mature? Society, as a whole, automatically assumes that all eighteen year olds are mature enough to be considered adults. If this is the case, why are eighteen year old adults not considered old enough to go to a bar and drink. How is it that eighteen year olds, fresh out of high school, are mature enough to sign up to get sent away from their families to fight in wars. Eighteen is not mature: but whos to say when someone is actually mature? People develop at their own pace, it does not make sense to put everyone into categories by age group because not everyone in that age group is at the same maturity level. Studies have proven that the current drinking law in the United States does not prevent underaged drinking, currents drinking laws actually encourage dangerous binge drinking across the country. Forty percent of college students, ages eighteen through twenty three have shown signs of alcohol abuse and/or alcohol dependence (College presidents seek debate on drinking age.). That does not include every college across the United States or all of the teenagers (eighteen through twenty three) that did not enroll in college at all, the number of young adults and drinking problems is much higher than what researchers have found in a small quantity of teenagers throughout America. Society has drilled into our minds that twenty one is when people are mature enough to drink but research shows that twenty one year olds still drink just as irresponsibly as an eighteen year old high school student does. There is actually not much of a difference in maturity between eighteen and twenty one. There are actual federal records that prove this statement. One hundred and fifty seven people ages eighteen through twenty three drank themselves to death proving there is not much of a maturity difference. You would assume the older and more mature the person is the more responsible when they drink which is obviously not the case. Recently there have been five hundred thousand injuries and one thousand seven hundred deaths in just one year due to people drinking between the ages eighteen through twenty one ( College presidents seek debate on drinking age.). Approximately one hundred eighty thousand eighteen year olds enlist in the American Armed Forces per year (joining the military). Why does society assume that an eighteen year old is mature enough to understand the life or death decision of going to war? These soldiers have no control over where they are to be sent to or for how long. Young soldiers do not see the future consequences to joining the United States military. Few soldiers never see war while they are serving but for the ones that do it causes lots of psychological disorders such as post traumatic disorder, or traumatic brain injury. Post traumatic stress disorder or PTSD is a failure to recover after experiencing or witnessing a traumatic event. Most veterans that suffer from PTSD experience night terrors, flashbacks, anxiety, depression, and insomnia. Veterans with post traumatic stress disorder also have the tendency to avoid certain situations that could possibly bring back the trauma they desperately are trying to forget. More than three million veterans are diagnosed with PTSD per year and will have to suffer with this disorder for the rest of their lives. Traumatic brain injury or TBI is a brain dysfunction that is caused by an outside force such as a nearby bomb explosion or a violent blow to the head. Veterans that suffer from TBI often have headaches, seizures, dizziness, ringing in their ears and speech difficulties. These veter ans often times have problems that are not easily noticeable because it is all cognitive. TBI sufferers have sleep and visual disorders that are irreversible and these veterans will never get a break from this very harsh and very unmerciful brain dysfunction. More than two hundred thousand united states veterans are diagnosed with traumatic brain injury per year. How is it that Americans thinks it is okay to send our youth to a foreign country to defend our freedom and put themselves in a life or death situation with a gun in hand but can not be in their own native land that they risked their lives for with a beer in their hand? Americas youth does not realize that enrolling in the military regardless if they go to war or not makes them more vulnerable to mental disorders not including PTSD and TBI. Not only does it does it make their more vulnerable to mental disorders but they are more likely to commit suicide because of the harsh conditions they are put in and because of the awfu l things they have to deal with. They often become dependent on alcohol or drugs to try and cope with the memories and images permanently engraved in their minds. In conclusion, I feel that America as a whole should reconsider the age of maturity. Not saying that all eighteen year old teenagers are incapable of making wise decisions but that the majority of our youth, ages eighteen through twenty one, are expected to be mature and are sent off into the real world; most of them not having a clue what they are getting themselves into. Some teenagers are desperate to join the military for the free education and the benefits but do not understand the consequences that come along with it. If eighteen is too young to drink a beer then eighteen is too young to sign up to risk your life. Works Cited Alexander, Caroline. Blast Force. Blast Force | National Geographic, National Geographic, www.nationalgeographic.com/healing-soldiers/blast-force.html. College presidents seek debate on drinking age. Modern Brewery Age, 25 Aug. 2008, p. 1. General OneFile, go.galegroup.com/ps/i.do?p=GPSsw=wu=j020902v=2.1id=GALE%7CA209904006it=rasid=cf0f93f12265d8dcdf0dea9c8a628d9e. Accessed 27 Jan. 2017. - Joining the Military. Joining the Military Military.com, www.military.com/Recruiting/Content/0,13898,062006-who-joining-marines-today-myth-fact,,00.html?ESRC=recruiting.nl. Accessed 20 Feb. 2017. Kids today and their negligence to vote. UWIRE Text, 13 Oct. 2016, p. 1. Educators Reference Complete, go.galegroup.com/ps/i.do?p=PROFsw=wu=j020902v=2.1id=GALE%7CA467440428it=rasid=b7706d28fe36ae9a650061919ef11777. Accessed 7 Feb. 2017. Raloff, Janet. The dangers of vaping: teens are falling for flavored e-cigs, but the vapors they inhale may be toxic. Science News, 11 July 2015, p. 18+. Research in Context, go.galegroup.com/ps/i.do?p=MSICsw=wu=j020902v=2.1id=GALE%7CA421769268it=rasid=68c8c2598405c9859f34e25925b2bf3d. Accessed 9 Feb. 2017. Masturbation: Prevention and Treatment | Article Review Masturbation: Prevention and Treatment | Article Review Jamie Burden Scholarly Article on the Prevention of Masturbation: The scholarly article under consideration is Masturbation: Prevention and the Treatment written by A.Shekarey, M.Sedaghat Rostami, Kh.Mazdai, A.Mohammadi first published in Procedia (A.Shekarey, 2011) as a peer reviewed scholarly article. The article investigates the topic of masturbation thoroughly. The authorââ¬â¢s goal was to provide authentic evidence showing the ill effects of masturbation and the article is focused on providing a solution to the sexual addiction called masturbation. Within the articles they have discussed various scenarios that can be put to implementation in order to prevent masturbation. According to the authors a study conducted in Iran showed that Iranian men and women, ninety-two and sixty-two percent respectively, have masturbated during their life and no sexual activity is as controversial but common as masturbation (A.Shekarey, M.Sedaghat Rostami, Kh.Mazdai, A.Mohammadi, 2011). This study attempts to investigate the most important and the commonest s exual threat, masturbation, to teenagers and the youth, especially among the university students and to provide some information about physical, mental, spiritual, moral and ethical damages of masturbating (A.Shekarey, M.Sedaghat Rostami, Kh.Mazdai, A.Mohammadi, 2011). Further in the studies, the article explains the possible causes of masturbation. According to the journal there can be several reasons that can and will lead from sexual frustration and develop in to masturbation. They also discussed the ratio of masturbation among men and women, according to the journal men are more addicted to masturbation than women. They further state that teenagers are more than likely to start puberty when they are in high school, so they should be provided with enough knowledge of sexual harms and procedures (A.Shekarey, M.Sedaghat Rostami, Kh.Mazdai, A.Mohammadi, 2011). Masturbation is an action equally condemned by both the female teenagers and male teenagers. Although, there are several purposes a teenager will participate in this practice such as to avoid depression and tension in daily life. Authors highlighted the negative effects of the masturbation on the physical and mental health of the teenagers. Symptoms were also mentioned along with their social damages. Coming to the main aim of the paper, author gave enough ideas to treat and prevent the act of masturbation (A.Shekarey, M.Sedaghat Rostami, Kh.Mazdai, A.Mohammadi, 2011). In the conclusion the authors state that there can be several ways to satisfy the sexual desires; some are deemed acceptable and some are not. According to the journal masturbation is considered to be an unacceptable way of satisfying ones sexual desires. Teenagers should be better educated concerning the mental and physical damages that can be expected from masturbation when they begin puberty. Sex education should be provided through many scientific programs and therapies. It should be noted that a mentally and physically healthy teenager can become a resourceful youth. The guidance of parents and teachers should be there in order to clear all their doubts about a healthy sexual behavior. In short the authors tried to prove the ill effects of the masturbation through the statistics and primary sources. The study mainly targets the teenagers and children near puberty. According to them sexual education is the best way to prevent masturbation and other ill sexual habits (A.Shekarey, M.Sedaghat Rostami, Kh.Mazdai, A.Mohammadi, 2011). Popular Media Article on the Prevention of Masturbation: The popular media article that was chosen in regards to the prevention and the treatment of masturbation is How to Stop a Masturbation Addiction written by Gary Wickman this was first made available online from the website of the Healthy Guidance. In this article the author shows support in regards to the act of masturbation. According to Wickman masturbation is good for your sexual health in certain ways, but one should be moderate when it comes to the act of masturbation. Too much masturbation can affect your daily life and it can become highly addictive (Wickman, 2014). It is really important to control the addiction of masturbation, if not controlled even the slightest stimulation can cause sexual arousal. There are people that use masturbation as a form of self-medication with the intent of treating their various daily life issues. It is almost impossible to control daily issues, but remains imperative to control the addiction of masturbation, as excessive masturbation can be da maging in many ways (Wickman, 2014). The author Gary Wickman provides various techniques with the intent to control masturbation; he explains how one can be their own doctor and should have the knowledge of how to control ones desires. One should create rules and follow them strictly; such as masturbating only once a day. Along with that setting a time limit and strictly following this criteria will help with self-control. One of the most imperative things is to focus on the negative effects of masturbation; by teaching oneââ¬â¢s self that time is valuable and should not be wasted by becoming addicted to masturbation and that becoming a person of self-control and the rules should not be broken. There are certain parts of the day, when one wants to masturbate or the desires for masturbation become stronger, by becoming involved with activities or hobbies during that time of day will help maintain self-control (Wickman, 2014). By determining the underlying causes of obsessive masturbation, whether it stems from sexual frustration or the physical vulnerability. Regardless of the reason, the opportunity allowing one to address the addiction directly rather than suppress the issue of masturbating will show to be more beneficial. In this article the author Gary Wickman targets the male and female audience whom are addicted to masturbation; his main focus was to provide addicts with various techniques to avoid over masturbation. Wickman did not use any scientific data or the public data statistics to prove his point and address the issue. He also used general methods as the remedy, not the medical and the psychological techniques. Critique: Both the scholarly article and the popular media article deal with the issue of the masturbation and provide different techniques to control or prevent the addiction of masturbation. According to both, the addiction of masturbation can be harmful for your mental or physical health. In the scholarly article, several statistics and primary references were given to prove the point. While in the popular media article no such types of references were given. Audiences are found to be different for both the articles; scholarly article is a journal published paper and addresses the teenagers hitting puberty on the other hand popular media article is for people with the addiction of the masturbation. Though, they both include the female and the males in their audiences. The greatest difference is found to be in the support of the actual act of masturbation. The scholarly paper clearly expresses disapproval of the idea masturbation and explains how it considers masturbating to be a great threat to the physical and the mental health of a person. While the Healthy Guidance article by Gary Wickman clearly states that it considers masturbation to be a healthy sexual activity. But does find that excessive masturbation can be dangerous for oneââ¬â¢s health. Due to the published paper standard, scholarly article can be used as the primary source for the further research while the popular media article can only benefit the online audience. The main difference of presentation is the lack of the references in the popular media article. This makes it weak source for the further investigation. The scholarly article is beneficial in many ways for the audience in the similar religion country, but the popular media article is helpful for the population across the world with the masturbation addiction issue. Conclusion: The main aim of the paper is to investigate the outcomes of the sexual learning through popular media and the peer reviewed journals. There is a huge difference between the two. It is very much obvious that scholarly articles are based on a lot of research and the statistics and they usually deal with all type of problem in a particular discipline while the popular media articles only address the issues that are common and frequently asked for. One provides the formal sex education while the other provides general sex ideas. Sexual issues are sensitive issues and it is very much necessary to consult the article with the authentic views, popular media articles can be easy to find and access but they do not always provide all the necessary information that is pertinent to address the issue. By comparing both of the sources, there is one thing that can be highlighted effectively and that is the thoroughness provided. Scholarly articles are thorough in their findings and will always provide enough support to validate their point while the popular media article can be based on oneââ¬â¢s assumption or the hypothesis. Scholarly journals are not usually accessible and are difficult to hunt down, popular media articles can be found on all the platforms. Therefore it can be concluded that both of the articles are an excellent source of knowledge, but scholarly articles prove to be more authentic; popular media articles are easily available but they usually speak of the general issues and favor general point of views. References A.Shekarey, M. R. (2011). Masturbation: Prevention and Treatment. Procedia Social and Behavioral Sciences, 1641-1646. Wickman, G. (2014, October 18). How to Stop a Masturbation Addiction. . Retrieved from Health Guidance: http://www.healthguidance.org/entry/15619/1/How-to-Stop-a-Masturbation- Addiction.html
Friday, January 17, 2020
Why Does Bartleby Refuse the Aid of the Lawyer?
Herman Melvilleââ¬â¢s Bartleby the Scrivener is a confusing work of literature. Some researchers think that in the story Melville described himself. Some others think that this is because of madness that Bartleby behaves so weird and finally, dies. In reality, Bartleby refuses to check some copies, but that cannot mean he is mad.On the contrary, he chooses this himself. He chooses how to live his life and how to behave. Many people think his life is utopian. Many people also cannot understand why he behaves this way. Melville tries to prove that Bartleby has his principles and cannot betray them.That is why he refuses to accept aid from the Lawyer because he thinks that this aid will destroy his principles and his life. Of course, every person has his principles, and that does not mean that every person is mad. On the contrary, people who have their principles cannot be mad. They are reasonable and conscious, even when their ideas seem to be utopian. ââ¬Å"The utopian spirit as w e have been discussing it, is revealed through the written words of men who were critical of the world they lived in and dreamers of a better worldâ⬠(Anonymous). And Bartleby, too, sees the world with a critical eye.On the one hand, he does not want to accept this world as he sees it. On the other hand and because he cannot accept this world as he sees it, he also creates his own world. This world is very comfortable to him, and Bartleby does not want anyone to interfere. ââ¬Å"His face was leanly composed; his gray eye dimly calm. Not a wrinkle of agitation rippled him. Had there been the least uneasiness, anger, impatience or impertinence in his manner; in other words, had there been any thing ordinarily human about him, doubtless I should have violently dismissed him from the premisesâ⬠(Melville).Melville describes Bartleby as a very calm and balanced person. When he refuses to check the copies he does not show that is he worried or disturbed. He sees that the Lawyer is getting very angry and disturbed. He also sees that the Lawyer is becoming very irritated. If Bartleby were insane, he would not be able to preserve balance and calmness. If he were insane he would be more emotional with the Lawyer. Moreover, he is very confident that his principles of life are very correct. If he were not that confident, he would not make the Lawyer so much curious about himself.He would not be able to be so calm and to defend his principles. When he answers the Lawyerââ¬â¢s questions he does not lose his patience, because he knows that his principles are the best and that he has the right to use these principles in his life. He also knows that the Lawyer cannot break these principles. When he defends them he seems solid like a stone. But he also fears of losing these principles and his stability. That is why he does not want to answer the Lawyerââ¬â¢s questions: ââ¬Å"Will you tell me, Bartleby, where you were born?ââ¬â I would prefer not to. ââ¬â Will you tell me anything about yourself? ââ¬â I would prefer not toâ⬠(Melville). It is very probable that Bartleby has his own theory of life. He knows that the Lawyer wants to help him, but he also knows that if he accepts this aid, he will not be able to live as he lived before. He will not be able to protect his principles from the Lawyer. The story about Bartleby shows how difficult it is for a person to be successful. It is a material world. It values farms, goods, estates, and other material things.Unfortunately, ââ¬Å"the ways of trade are grown selfish to the borders of theft, and supple to the borders of fraud. The employments of commerce are not intrinsically unfit for a man, or less genial to his faculties, but these are now in their general course so vitiated by derelictions and abuses at which all connive, [â⬠¦] that nothing is left him but to begin the world anewâ⬠¦Ã¢â¬ (Emerson). That is why to avoid these problems Bartleby creates his own wo rld. In this world he has no obligations. He can do what he wants. He can refuse checking the copies. He can refuse working.He can also refuse leaving the office. This world is very different from the one in which we live. Still, this is the world in which Bartleby wants to live. Bartleby does not have a house; he does not speak about his past; he does not speak of anything at all and spends all his time at the Lawyerââ¬â¢s office at Wall Street. One day he refuses to fulfill his working obligations. He is not willing to leave the office; nor is he willing to leave the Lawyer. Unfortunately, no one can understand Bartleby. Everyone thinks he is insane. For this reason, he becomes a vagrant and soon dies.But what can happen if some day Bartleby decided not to refuse the Lawyerââ¬â¢s aid? Would this aid help Bartleby return to the normal world? No, it would not, but would make it more difficult for Bartleby to defend his principles. If he accepted the aid, he would also have to accept all other norms of the modern world. However, because Bartleby is so active and brave in his wish to protect his principles and his life, he influences and changes everyone around him: ââ¬Å"Somehow, of late I had got into the way of involuntary using this word ââ¬Ëpreferââ¬â¢ upon all sorts of not exactly suitable occasions.And I trembled to think that my contact with the scrivener had already and seriously affected me in a mental wayâ⬠(Melville). That is why Bartlebyââ¬â¢s behavior is not because of his madness but because of his strength and power, which he uses to live. When he refuses the Lawyerââ¬â¢s aid he also builds a wall between himself and the rest of the world. He does not want the Lawyer to become a part of his world. He is an idealist. His world is utopian.Many of us would want to live the life in the same way, but not all of us would be able to protect their principles from influence. Conclusion Herman Melvilleââ¬â¢s Bartleby the Scrivene r is one of the most confusing works of literature. On the one hand, readers cannot understand who Bartleby is, who he was, and who he wants to be. On the other hand, everything we read about Bartleby looks like the story about a mad man. In reality, it is not madness, and Bartleby himself chose his life and his principles.Moreover, he wants to protect his life and his principles from anyoneââ¬â¢s influence. That is why he refuses to accept the Lawyerââ¬â¢s aid, because he is afraid that the aid will destroy his principles, his life, and the world he has created for himself. Works Cited Anonymous. ââ¬Å"About Utopia and Utopian Literature. â⬠Emerson, R. W. ââ¬Å"Man the Reformer. â⬠A Lecture Read Before the Mechanicsââ¬â¢ Apprenticesââ¬â¢ Library Association, Boston, January 25, 1841. Melville, H. ââ¬Å"Bartleby the Scrivener: A Story of Wall-Street. â⬠Virginia Commonwealth University, 1853.
Thursday, January 9, 2020
E-commerce is in fashion - Free Essay Example
Sample details Pages: 18 Words: 5312 Downloads: 1 Date added: 2017/06/26 Category Statistics Essay Did you like this example? Background E-commerce is in fashion so many companies of all sizes and types are reviewing their sales strategies.Ãâà Consideration is being given to either (or both) selling to other businesses electronically (B2B) or selling directly to individual customers over the Internet (B2C).Ãâà Many companies are failing to live up to expectations, with problems such as poor website design making ordering difficult, website failure (crashes) from overload or because they were incomplete, failure to confirm the order, subsequent out-of-stock, failure to deliver on time. Donââ¬â¢t waste time! Our writers will create an original "E-commerce is in fashion" essay for you Create order The Project Brief You, as the project manager, are to plan a project for a Triangle software house to develop an online Hotel Management system for an international hotel chain.Ãâà The project is scheduled to start on6thof July 2010. The project should have the following options Guests: Room Reservations for guests Services: Adding other services use, restaurant use, bar use by guests Maintenance: To maintain records in the system Inquires: To know about availability of rooms, reservations, gust lists Four computers have to be supplied for the selected project and these computers needs to be networked. Required time schedule for the project is three months. From the Project Managers point of view, an e-commerce project is no different from any other project.Ãâà You need a framework to plan resources and budget; you must set the plan against an appropriate calendar; and you need to ensure that you include the managerial and quality-related tasks that will help the project manager succeed. You need to plan how the project should be initiated.Ãâà However, your initiation plan should be presented in sufficient detail for someone else to manage it.Ãâà You are not expected to have all the answers at this stage; part of the skill of project planning is to ensure that you put the tasks in place to find out what is unknown and to manage the obvious risks. Task 1 (a) As the Project Manager, you are expected to decide on the following: 1. The tasks required to carry out the project aim for at least 10-15 tasks.Ãâà Traditional File System (SDLC-System Development Life Cycle) Strategic Study Business study Feasibility study Requirement analysis Requirement Specification Logical system specification Logical Design Physical Design Coding Testing Implementation Maintenance Paste out Relate Traditional File System steps to Hotel management system Case Study. We use Traditional File System for Hotel management systemto develop their system. Strategic study: Project Manager goes to the Hotel study the current system; after he understood what the system that they need to develop is what they technology must use to develop the hotel. Business study:- Project Manager prepare a document project initiation document this will give the generalÃâà definition for the developing systemÃâà that document shown to the hotel managing director we get the approval to proceed the development the new system. Feasibility study: These step uses to traditional file system how to feasible for hotel computerizes Economical, Technical Operational, even the developing system is most modern if end users are working within difficulty that system isnt operational but this system is not difficulty use. Cost effective ways and ensuring that the investment can be recovered and realize the benefits with allocated budget. The technology needed is available and can be integrated with the other systems of the organization. Deciding how the new system going to fit the current operational system and whether its operationally acceptable. Checking whether the new project is violating law both local and international Requirement analysis: Firstly we interview Hotel managing Director asked question about the current system what they want to include their system to computerize ..,.Ãâà Investigating forms and documents which are very useful to determine system data flows and transactions Identifying the outputs by investigating below reports, Hourly report Daily report Monthly report Yearly report Then Checking latest updated procedure manuals and user manuals To study user activities and to concentrate on how it is being handle. Interviewing and supervisor level users to gather opinions about the efficiency about the system, determine the needs of the users that to be in the new system, more specific details about the system. Producing and arranging online Questionnaires for all operational users who are going to use the system. By this can gather information from all the people who are going to have direct contact with the system. Planning formal observation sessions at 3 main hotels, specially the reception area And closely observing the activities performed by the users. And observing customer inquiries reservation process etc Studying a subset documents or subset of the activity in the area in order to get an impression of the whole activity or document set .it is useful to verify findings from interviews or the above discussed techniques. Requirement Specification: How the new computer system should be working this is a kind of the document which clearly specifies the requirement of the users. Use :- Entity Relationship Diagram (ERD) Ãâà Data Flow Diagram (DFD). Logical system specification:- This hotel computerize systemÃâà include several logical specification there are may be several technical option that could be adapted which are capable of delivering the requirement in this stage system analysis first design define what those technical options and then the help of manager select the most suitable option. Logical Design: This step we design a dialog design initial interface are design Update process that change on the line system data and Enquiry process concern the interaction of useful information from system data.(we should involve the hotel manager very strongly specially dialog design influence how to system looks and behave to its users) Physical Design: This step we design program design database design (ERD map into database components), this stage provides all the information required by the programmer. Coding: We use language is Visual Basic for coding.(First programmer code will be written in short pieces that outlines simple as well-defined program function.) Testing:- we tested correctness testing, performance testing ,reliability and recovery testing then security testing stress testing usability testing, unit and integration testing external function testing ,system testing, regression testing, acceptance testing, installation testing, completion testing, test documentation.(Ãâà discover and rectify errors below steps are planned to be done) Implementation:- This stage involve preparation of the target side and making the environment the network here the hotel new system to target environment will done and prepare in the user manual and training the hotel worker for the New system.| System will be installed shared in 4 computers which will be networked [LAN] (Configuration with I7 processors, 4 GB Ram..) With all required software. 2. Decide on appropriate task dependencies and state durations of them. Task Duration (1= 1 day)Reference Strategic study 1 A Business study 1Ãâà B Feasibility study 1 C Technical Feasibility2 Operational Feasibility1 Legal FeasibilityParallel with Op Feasibility(1) Economical Feasibility3 Requirement analysis D (Forms and documents)1 (Reports)1 (Procedureuser manuals)1 Interview-(Management level)3 Interview-(Supervisor level)3 (Questionnaires)1 (Observation)2 (Subset documentsactivity)1 Requirement specification 3 E Logical system specification 2F Logical design 10 G Physical design 20H Coding 5 I Testing J (Unit) 5 (Integrated) 1 (System)1 (User)2 DebuggingParallel with testing(8)K Implementation L (Installation)2 (User Training)2 (Parallel Running)7 MaintenanceContinues until phase out.M Total Duration81 -The explained tasks in task 1 are shortened and listed down above, under task name. -The Duration 1 is equals to 1 day. -Maintenance starts after implementing the project until phase out. -Total days for the project is 87-(81- planned days, and balances 6 days are to manage risks during the project period. Activity Reference Dependency Duration Strategic study A 1 Business study B A 1 Feasibility study C B 6 Requirement analysis D C 13 Requirement specification E D 3 Logical system specification F E 2 Logical design G F 10 Physical design H G 20 Coding I H 5 Testing J I 9 Debugging K I 8 Implementation L J,K 11 (Table1.1) 3. Create an Activity Net work Diagram with respect to your identified tasks,AND must be given using a standard Tool such as MS Project or MS Visio Critical path- AÃâà B C D E F G H I JÃâà L MS Project Output (b)There are many elements in a typical project plan. One such element is theÃâà Introduction which briefly describes the objectives of the project and the constraints, which affect project management. Prepare such introduction for this project using reasonable assumptions. List and explain with a sentence each other contents of a typical project plan. I am Nadeeshani and Im appointed as a project manager to develop this online hotel Management system for an international hotel chain by the triangle software house. The project is based on upgrading the existing system as an online system along with these main functions, Room reservations for guests The options to add other services like restaurant use, bar use, gym use, etc The system which has the ability to obtain inquires from the guests and the ability to give them an answer/feedback, for example for the customer queries like availability of rooms, reservations and guest list, etc. And to get all the above updates and inquiries from the parties and to maintain the records in the system We hope to start the project on 6Th of July 2010 and we were going to be finished in September 30th 2010 (3 month) period. On that project running period we are considering Saturdays Sundays as working days. We hope to finished this project 26Th of September 2010. The project has run 87 days but we are planning to be completed within 82 days rest 5 days we are planning to do collecting unanticipated problems complete the project report however we will make sure to complete this project in this 87 days period. This is the project plan how we are going to do the project. I hope the committee members will do their best to complete the project. The quality of the system will be maintained throughout the project by regular progress checking and progress monitoring. The project has been run through the 13 stages. Strategic study Business study Feasibility study Requirement analysis Requirement specification Logical system specification Logical design Physical design Coding, Testing Debugging Implementation Maintenance These stages are planned in a greater level of detail. (These plans are used to track progress on a week by week basis through regular progress monitoring.) These stages are also separated into sub tasks basically contains the lowest details. It will specify activities down to a daily level. This will be created in parallel with the above mentioned stage plans. And the monitoring and tracking will be on daily basis. As a project manager I hope we will be finished the project with less errors I believe you all are will be do your best. Clearly indicated whose responsible for what in the project, clearly shown what the project is to deliver, why and for whom and by making the project that can easily understand by everyone, mainly on time and within budget My motivation is to completely utilize my accumulated experience and knowledge to the fullest extent possible and making this projects a success. Task 2 (a) Explain what are your typical responsibilities as a Software ProjectÃâà Manager in managing any type of software project and your typical tasks A software project manager has the overall responsibility for the successful initiation, planning, execution and closure of a project. A successful Project Manager must simultaneously manage the four basic elements of a project: resources, time, money, and most importantly, scope. All these elements are interrelated. Each must be managed effectively. All must be managed together if the project, and the project manager, is to be a success. Resources People, equipment, material Time Task durations, dependencies, critical path Money Costs, contingencies, profit Scope Project size, goals, requirements This title is used in the construction industry, architecture, information technology and many different occupations that are based on production of a product or service. The project manager must possess a combination of skills including an ability to ask penetrating questions, detect unstated assumptions and resolve interpersonal conflicts as well as more systematic management skills. The role of the project manager encompasses many activities including :-Planning and Defining Scope, Activity Planning and Sequencing, Resource Planning, Developing Schedules, Time Estimating, Cost Estimating, Developing a Budget, Controlling Quality, Managing Risks and Issues, Creating Charts and Schedules, Risk Analysis, Benefits Realization, Scalability, Interoperability and Portability Analysis,Documentation,Team Leadership, Strategic Influencing, Customer Liaison. As a software project manager my typical tasks in managing a software project will be below. Manage the production of the required product. Direct and motivate the project team. Plan and monitor the project. Manage business and project risks. Responsible for change control. Report the true progress report and stage assessment to the steering committee. Prepare the end project report. Responsible for project administration. Responsibility Matrix In a large project, there may be many people who have some role in the creation and approval of project deliverables. Sometimes this is pretty straightforward, such as one person writing a document and one person approving it. In other cases, there may be many people who have a hand in the creation, and others that need to have varying levels of approval. The Responsibility Matrix is a technique used to define the general responsibilities for each role on a project. The matrix can then be used to communicate the roles to the appropriate people associated with the team. This helps set expectations, and ensures people know what is expected from them. On the matrix, the different people, or roles, appear as columns, with the specific deliverables in question listed as rows. Then, use the intersecting points to describe each persons responsibility for each deliverable. Ex: Project Sponsor Project Manager Project Team Client Managers Analysts Requirements Management Plan A C R A R Requirements Report I, A R R I, A C Process Model R R R I, A C Data Model R R R I, A C Requirements Traceability Matrix R R R R C (Table 2.1) A Approves the deliverable R Reviews the deliverable (and provides feedback). C Creates the deliverable (could be C (1) for primary, C (2) for backup). Usually there is only one person who is responsible for creating a deliverable, although many people may provide input. I Provides input N Is notified when a deliverable is complete M Manages the deliverables (such as a librarian, or person responsible for the document repository) In the table above, the Requirements Management Plan is created by the project manager, approved by the sponsor and client managers, and reviewed by the project team and analysts. The purpose of the matrix is to gain clarity and agreement on who does what, so you can define the columns with as much detail as makes sense. For instance, in the above example, the Project Team could have been broken into specific people or the person responsible for creating the Data Model could have been broken out into a separate column. After the matrix is completed, it should be circulated for approval. If it is done in the Project Charter process, it can be an addendum to the Project Charter. If it is created as a part of the initial Analysis Phase, it should be circulated as a separate document. Examples of responsibility codes are as follows. Our project may define different codes, as long as you explain what they mean so that people know what the expectations are for them. References https://www.lifecyclestep.com/open/407.0LifecycleRoles.htm (b) Briefly explain how you are going to manage the risk in the above project. Risk management is the process of analyzing exposure to risk and determining how to best handle such exposure. The project is planned to be a continuous process throughout the project until completion and considered in two main parts, the risk analysis part and the risk management part. I have planned to run risk management as below, At the start of the project, as a part of the decision of whether to undertake the project And at every end stage assessments Risk management includes the following activities Planning how risk management will be held in the particular project. Plan should include risk management tasks, responsibilities, activities and budget. Assigning risk officer a team member other than a project manager who is responsible for foreseeing potential project problems. Typical characteristic of risk officer is a healthy skepticism. Maintaining live project risk database. Each risk should have the following attributes: opening date, title, short description, probability and importance. Optionally risk can have assigned person responsible for its resolution and date till then risk still can be resolved. Creating anonymous risk reporting channel. Each team member should have possibility to report risk that he foresees in the project. Preparing mitigation plans for risks that are chosen to be mitigated. The purpose of the mitigation plan is to describe how this particular risk will be handled what, when, by who and how will be done to avoid it or minimize consequences if it becomes a liability. Summarizing planned and faced risks, effectiveness of mitigation activities and effort spend for the risk management. As an analyzing tool to assist in the risk management process, Decision tree is used to analyze the risks, Because the explanation for the result is easily described by simple graph in a simply understandable way which can be combined with other decision techniques as well. Important details can be generated based on its alternatives, probabilities, costs and their preferences for outcomes. First after analyzing the possible risks by identifying, Estimating the effectiveness by comparing the likelihood with the impact of a risk and finally evaluating by confirming that they are in correct sequence and the cross checking with the risk reduction options assessing the acceptable level of each other. We select the most suitable risk management approach for each risk and a detailed plan of action which confirms its goals will be prepared by discussing with members. The risk management consist four main activities and below tasks will be completed at the end of each part. Planning-: Most appropriate selection will be selected for each risk and a detailed plan of action which confirms its desirability and objectives will be developed. Sometimes this activity may proceed in parallel with risk evaluation. Ãâà §Resourcing-: This will identify and assign the necessary resources to do the work and will confirm that the revised plan is feasible and cost effective. Ãâà §Controlling-: This will make sure that the execution of the plan is having the desired effect on the risk. This will ensure the management of the risk process will apply effectively and it will modify the plan where it necessary. Ãâà §Monitoring-: This will check the stages of the risk and also check that the counted measures are happening effectively. During monitoring, if it feels that the risk management plan is ineffective, then we can go back to the risk analysis part. When managing the risks these below features will be considered mainly, Factors that need to continue correctly, threats, systemic risks for the successful delivery project and benefits, risks to the business, risks for the customers and suppliers, risks of unexpected outputs and success of the international hotel chain. This is how I have planned to manage the risk, which can happen during a process and which will effect with a negative result to the process in the project. Task 3 Configuration Management is an essential part of a project. In a large project Configuration librarian plays a major role. Configuration management (CM) is the detailed recording and updating of information that describes an enterprises hardware and software. Such information typically includes the versions and updates that have been applied to installed software packages and the locations and network addresses of hardware devices. Special configuration management software is available. When a system needs hardware or software upgrade, a computer technician can accesses the configuration management program and database to see what is currently installed. The technician can then make a more informed decision about the upgrade needed. An advantage of a configuration management application is that the entire collection of systems can be reviewed to make sure any changes made to one system do not adversely affect any of the other systems Configuration management is also used in software development, where it is called Unified Configuration Management (UCM). Using UCM, developers can keep track of the source code, documentation, problems, changes requested, and changes made. (a) Briefly out line some configuration items in the project given in the scenario. Manage the configuration: Hotel Management systemPlan what is required and how it will be achieved Guests: Room Reservations for guests Services: Adding other services use, restaurant use, bar use by guests Maintenance: To maintain records in the system Inquires: To know about availability of rooms, reservations, gust lists Four computers have to be supplied for the selected project and these computers needs to be networked. Required time schedule for the project is three months. (Use a Configuration Management Plan (Project Quality Plan) Identify components of the final product Use Defining and Analyzing Products (PL2) to create a Configuration Item Record Use unique identifiers for each product and each version: Project Product Type Product Name Product Version. Control changes to baseline products by using change authority Submit products to the Configuration Librarian to put under configuration control Release (issue) products and/or copiesS Product Status Account to record and report product information Report the status of products from the Configuration Librarian Verify product integrity Perform product configuration audits by the Configuration Librarian Perform project audits by Project Assurance. In the above hotel management system developing project at each stage end as an output as below final deliverables will be reported. 1st stage -Strategic study -information technology strategy will be produced. 2nd stage Business study -project initiation document. 3th stage Feasibility study- Feasibility report. 4th stage -Requirement analysis- the gathered exact requirements of the users to developÃâà Ãâà Ãâà the system will be produced as Requirement analysis report 5th stage -Requirement specifications-the requirements will be produced in a diagrammatic way and a wordy report. 6th stage Logical system specification -the mapped business and technical aspects of the system will be produced. 7th stage Logical design- interface design will be produced. 8th stage -Physical design -the database design and program design using miniature specifications like pseudo codes, flowcharts, structure diagrams, etc will be produced. 9th stage -Coding- the written program which is written with a programming language will be produced. 10th stage -Testing -testing report. 11th stage -Debugging-debugging report. 12th stage -Implementation- the released version of the system in the target environment. 13th stage -Maintenance-reports regarding the changes carried out throughout the system after the implementation. (b) Give a statement of the configuration librarians responsibilities. Configuration Librarian is the guardian of all the master copies of the projects products. Ãâà Ãâà The role will be also to look after change control on behalf of the project manager. PurposeÃâà : Custodian and guardian of all master copies of the projects products Receives, baselines and releases (issues) products Updates the product status and informs the Project Manager Maintains the Issue Log. The major tasks of the configuration librarian are summarized as follows:- To control the receipt, identification, storage and issues of all project products To provide information on the status of all products To number, record, store and distribute change control documents The specific responsibilities of the configuration librarian are as follows:- Assist the project manager to prepare the configuration management plan Create libraries at other storage areas to hold products Assist in the identification of products Create configuration item description records Hold the master copies of all project products Maintain the change control records Assist in conducting configuration audits Liaise with other configuration librarians where products required by the project are common to other systems (c) Briefly outline what are the things that we must consider in change control of Project Management. In this hotel management system development, will develop several documents that include all the importance issues regarding toÃâà the development but sometime these document may need to be changed due to various reasons, when doing this changers it has to be done by stranded procedures its called ChangeControl . The change control document is the formal way into this projects any enquiry of a complaint or request, it can be raised by anyone associated with hotel project about anything such as:- A new function occurrence A frailer of a product In meeting some aspect of the user requirement Because of a possible misunderstand A problem with the planning A frailer of communication The change control mainly it has recharge control document such as:- Question document (when a question occurs about a change) It will be submitted to the configuration library and the configuration librarian will log about this and will allocate a unique identity. Then he will pass a copy to the originator and it will sound the change control document is open. Unresolved change control documents are revealed at regular meetings. The project manager will be leading these meetings the users other representatives will be joined to that. In these meetings, all documents will be evaluated focused to making recommendations for solutions. Actually, the considered things and effect will be the following:- If the problem has been raised due to a misunderstanding by the creator, then the creator must be explaining what the misunderstandings are? Then problem will be closed. If the problem is proposing a change to a configuration item, then it should be prepared the request for change. If the project doesnt meet its specification, then it should prepare an off specification. To prepare those documents extra evaluations are required. ÃÆ'ÃÅ" Request for change document The things to be considered In the Request for change document stage Proposed changers as per the user requirements what are the user requests for change document must go through the analyst. Then analyst to be decided how much work is involved how many senior members appropriate skill are wants to do this work. The configuration librarian will help to identifying the any other procedures or configuration item will be affected. Request for change has to be awarded a prioritization. This can be one of the following High the system will not function without this change. Medium although the system can work without this change, it would be inconvenient without it. Low this does not affect the major functionality of the system. It is possible to work around the lack of this change without it being a major inconvenience. Cosmetic this only affects the appearance of an output or screen, not the data or functionality. It should be the job of the customer representative to provide the priority and canvas the other members of the steering committee. If the steering committee is taking the decision of the change, that decision may be to-Implement the change, Defer a decision until a later meeting, Ask for more information, cancel the request. These decisions should be documented on the change of control document. Whenever it states a change, a copy should be sent to the originator. ÃÆ'ÃÅ" off specification document stage An off specification is used to document any situation where the system fails to meet its specification in some respect. The configuration librarian allocates the next unique change control identifier and will send a copy of the document to its author. Senior team members with the help of the configuration librarian will carry out an impact analysis to discover which products are affected by the off specification. The decisions are taken by the project manager or the steering committee. When the steering committee is taking decisions, they may be to-Correct the fault, Delay the correction to an enhancement project after the current one is finished, Defer the decision for a later meeting, Ask for more information. Task 4 The team members who work most effectively, it seems, never say I, and thats not because they have trained themselves not to say I.Ãâà They dont think I, they think we; they think team. Considering the above statement, appraise the role of the project manager when composing, developing and managing the team. Composing, developing and managing a team is not an easy task. It needs lots of talent, hard work and responsibility. A project manager does this. The project managers prime responsibilities are to deliver the project on time, on budget and to an agreed standard. This means managing the production of the required product. It also means planning and monitoring the project, managing business and project risks, and being responsible for change control. Also, they must report the true progress of the project and the stage assessment to the steering committee. They are also responsible for preparing the end project report and for project administration. To complete all these tasks and to make the project a success, people are involved in all aspects of the project, and the importance of people in getting the job done cannot be overlooked. The project manager is dependent on people. Thats why the most important thing is the team. A team is all about the people. Because of the greater difficulty of tasks and the division of labor, team work is more important nowadays then ever before. The project manager is the person responsible person for preparing the plan for team work and forming and educating the team members. The project manager is also responsible for teaching the team members what is needed and whatever they dont know. This will improve the team members confidence level. The project manager also needs to monitor the employees work as theyre going along. The project manger will maintain the quality of teamwork at a high level by maintaining effective communication, coordination, and balancing the contributions, mutual support, effort and cohesion. Also, the project manger will ensure that the specific tasks are performed as a team. They will plan out the assigned activities in more detail if needed, completing the assigned project within the budget, timeline and quality expectations. They will also update others with the latest issues, and scope changes. They also need to look out for any risk or quality concerns throughout the project. They must also proactively and punctually communicate the status and manage the expectations of the project. The benefits of teamwork will definitely have a positive effect on the project. The project team carries a huge responsibility on its shoulders: the success or the failure of the project. Its members are the ones who execute the project and who give reports to the project manager. They also make changes and corrections when needed. Each member of this team has their own task, which represents a part of the whole project. So its extremely important that everyone understands and respects what they must do, in order to ensure a good final result. The characteristics of a good team member should be the following: be a productive member of the team and be able to be a team player. They should also have the knowledge and skills necessary to complete their allocated part of the work task. After completion of their part, each team member should be willing to assist other team members with completion of all work tasks until the project is completed. In conclusion, these characteristics of a team member will make the team more productive and the project a success. This is how and why a team and teamwork is important for a project. Without a doubt, the project manager plays a critical role in the completion of any project. Self Criticism Report This project could have been a better one if I had started it earlier, but due to the lack of importance that I gave to this assignment some aspects which I was hoping to include in this documentation were lost.
Wednesday, January 1, 2020
Subscribe to:
Comments (Atom)